Logo
     June 2020
Customer ClassConsumptionDemandLoad(June 13, 2020 to
  (kWh)(kW)FactorJuly 12,2020)
Schedule I-FZStreetlights12,521  9.11
Schedule II-RResidential200  10.61
Schedule III-PGeneral Service572  11.31
Schedule IV-PGeneral Power5,353  9.78
Schedule V-PBulk Power 36,50010050%9.17
Schedule V-W
Bulk Power-Wheeling            36,500100     50% 3.54
Schedule VI-PWholesale Power273,75075050% 8.24
Schedule VI-WWholesale Power-Wheeling
           273,750750     50% 2.61
Schedule VII-PSpecial Wholesale876,0002,00060% 7.61
Schedule VII-W
Special Wholesale-Wheeling
           876,0002,000     60% 1.98
      
Note:     
1.) Average rate was derived using the 0.75% Local Franchise Tax (LFT) of Cebu City.
2.) For the billing period, June 13, 2020 to July 12, 2020, NPC-PSALM Adjustment of Php 0.3884 per kWh or Php 0.1398 per watt for Schedule I and its corresponding VAT of 2.3449% will be implemented.
3.) Using the typical consumption of each customer class, except for schedules V, VI & VII.
4.) Schedules V & VI are simulated using a load factor of 50% and 60% for Schedule VII. Rates will vary depending on their load factor
5.) Implementation of the collection of Feed-in-Tariff FIT-ALL rate of Php 0.0495 per kWh or Php 0.0178 per watt will start this billing period.
6.) Implementation of the suspension of UC-Environmental rate of Php 0.0025 per kWh or Php 0.0009 per watt will start this billing period.