Logo
     July 2019
Customer ClassConsumptionDemandLoad(July 15,2019 to
  (kWh)(kW)FactorAug 14,2019)
Schedule I -FZStreetlights12,521 34,300 10.2590
Schedule II -RResidential200  11.9034
Schedule III-PGeneral Service572  12.1611
Schedule IV -PGeneral Power5,353  10.6504
Schedule V -PBulk Power36,50410050%9.6948
Schedule VI -PWholesale Power273,78075050%8.9590
Schedule VII-PSpecial Wholesale892,8002,00060%8.5092
      
Note:     
1.) Average rate was derived using the 0.75% Local Franchise Tax (LFT) of Cebu City.
2.)LFT Differential covering Talisay Area of Php 0.0061 per kWh or Php 0.002196 will cease starting the billing period July 15, 2019 to August 14, 2019
3.) For the billing period, July 15, 2019 to August 14, 2019, NPC-PSALM Adjustment of Php0.2708 per kWh or Php0.0975 per watt for Schedule I and its corresponding VAT of 2.3449% will be implemented.
4.) Implementation of the Universal Charge NPC Stranded Contract Cost of Php 0.0543 per kWh or Php 0.0195 per watt will be ceased starting this billing period.
5.) Using the typical consumption of each customer class, except for schedules V, VI & VII.
6.) Schedules V & VI are simulated using a load factor of 50% and 60% for Schedule VII. Rates will vary depending on their load factor.
7.) Demand of Schedule I-FZ is in Watts.