Logo
     Dec 2019
Customer ClassConsumptionDemandLoad(Dec 15,2019 to
  (kWh)(kW)FactorJan 14,2020)
Schedule I -FZStreetlights12,521 34,300 9.8069
Schedule II -RResidential200  11.3903
Schedule III-PGeneral Service572  11.7248
Schedule IV -PGeneral Power5,353  10.1635
Schedule V -PBulk Power36,50410050%9.4141
Schedule VI -PWholesale Power273,78075050%8.5344
Schedule VII-PSpecial Wholesale892,8002,00060%8.0437
      
Note:     
1.) Average rate was derived using the 0.75% Local Franchise Tax (LFT) of Cebu City.
2.) For the billing period, December 15, 2019 to January 14, 2020, NPC-PSALM Adjustment of Php0.2926 per kWh or Php0.1053 per watt for Schedule I and its corresponding VAT of 2.3449% will be implemented.
3.) Using the typical consumption of each customer class, except for schedules V, VI & VII.
4.) Schedules V & VI are simulated using a load factor of 50% and 60% for Schedule VII. Rates will vary depending on their load factor
5.) Demand of Schedule I-FZ is in Watts.