Logo
     Aug 2019
Customer ClassConsumptionDemandLoad(Aug 15,2019 to
  (kWh)(kW)FactorSept 14,2019)
Schedule I -FZStreetlights12,521 34,300 10.1886
Schedule II -RResidential200  11.8150
Schedule III-PGeneral Service572  12.1302
Schedule IV -PGeneral Power5,353  10.5948
Schedule V -PBulk Power36,50410050%9.3470
Schedule VI -PWholesale Power273,78075050%8.9216
Schedule VII-PSpecial Wholesale892,8002,00060%8.4607
      
Note:     
1.) Average rate was derived using the 0.75% Local Franchise Tax (LFT) of Cebu City.
2.)LFT Differential covering Talisay Area of Php 0.0061 per kWh or Php 0.002196 will cease starting the billing period August 15, 2019 to September 14, 2019
3.) For the billing period, August 15, 2019 to September 14, 2019, NPC-PSALM Adjustment of Php0.2962 per kWh or Php0.01066 per watt for Schedule I and its corresponding VAT of 2.3449% will be implemented.
4.) Regulatory Reset Refund is P -0.0447 per kilowatt hour or -0.0161 per watt for this period August 15, 2019 to September 14, 2019 only.
5.) Using the typical consumption of each customer class, except for schedules V, VI & VII.
6.) Schedules V & VI are simulated using a load factor of 50% and 60% for Schedule VII. Rates will vary depending on their load factor.
7.) Demand of Schedule I-FZ is in Watts.