top of page
visayan-electric-customer-services-banner.jpg

Invitation to Bid

This is applicable for building and structure constructions. It is also for short time events like All Soul's Day, concerts, rallies and the like and other temporary construction and repair works.

Temporary Application
Title
Created Date
Status
Power Transformer Requirement
12/11/2024
OPEN
APDU Consolidated Wires & Cables Requirement
12/09/2024
OPEN
Total Regasketing Requirement of 25/33 MVA Power Transformer TR1 at Calamba (CLB) TR1 Substation
12/06/2024
OPEN
APDU CONSOLIDATED POLE LINE HARDWARES REQUIREMENT
12/04/2024
OPEN
LILOAN SERVICE CENTER
11/14/2024
OPEN
Civil, Construction and Piping Services Requirement
10/31/2024
OPEN
2025 APDU CONSOLIDATED REQUIREMENTS - KWH METERS
10/15/2024
OPEN
APDU CONSOLIDATED CONCRETE POLE REQUIREMENT
10/14/2024
OPEN
THERMAL IMAGER REQUIREMENT
10/02/2024
OPEN
VISAYAN ELECTRIC SERVICES-RELATED PROJECTS
10/02/2024
OPEN
EMPLOYEE UNIFORM
09/20/2024
OPEN
VACUUM PUMP SET AND TRANSFORMER BUSHING ROD REQUIREMENTS
09/04/2024
OPEN
Visayan Electric Services-Related Projects
09/03/2024
OPEN
Project Aktiv - Implementation and Systems Integration of Enterprise Asset Management
09/02/2024
OPEN
Battery and Circuit Breaker Requirement
08/12/2024
OPEN
Services-Related Projects
08/09/2024
OPEN
Concrete Pole Requirement
07/10/2024
OPEN
Wires Requirement
07/09/2024
OPEN
Services-Related Projects
07/08/2024
OPEN
Bucket Truck Requirement
06/24/2024
OPEN
Unloading Services for Steel Poles Deliveries
06/24/2024
OPEN
Metering Equipment and Accessories
06/24/2024
OPEN
Circuit Breaker Requirement
06/24/2024
OPEN
Distribution and Power Transformers Requirement
06/13/2024
OPEN
2024 Communication Equipment Requirements
05/31/2024
OPEN
2024 Network Related Requirements
05/30/2024
OPEN
2024 Vehicle Requirement
05/30/2024
OPEN
Services-Related Projects
05/24/2024
OPEN
Cables and Cable Protector Requirements
05/23/2024
OPEN
Bus Pipe Connectors Requirement
05/23/2024
OPEN
2024 Motorcycle Requirements
05/17/2024
OPEN
APDU Consolidated Pole Line Hardwares Requirement
05/16/2024
OPEN
2024 APDU Requirements for Connector, Termination Kit and Fuse Cutout Holder
05/16/2024
OPEN
2024 Recloser Requirement
05/16/2024
OPEN
Visayan Electric Construction Related Projects
05/06/2024
OPEN
APDU Power Transformer and Switchgear Requirements
04/24/2024
OPEN
APDU Requirements for Insulators, Disconnect Switch, Capacitor, AVR AND CT
04/22/2024
OPEN
2024 Fiber Optic Cables and Accessories
04/15/2024
OPEN
Project MobileAP Additional Payment Aggregator
04/11/2024
OPEN
2024 APDU Seamless Pipe Requirements
03/26/2024
OPEN
FDAS and Access Control Integration for VECO-Banilad Compound
03/21/2024
OPEN
Fiber Optic Cable Installations
03/18/2024
OPEN
Distribution Transformer Servicing
03/18/2024
OPEN
Project Crown Systems Integrator
03/13/2024
OPEN
2024 APDU Fuse Cut-outs Requirement
03/04/2024
OPEN
2024 APDU Arresters (Surge and Lightning), Capacitors and Disconnect Switch Requirement Copy
03/04/2024
OPEN
Naga Service Center
02/20/2024
OPEN
Visayan Electric Construciton-Related Projects
02/06/2024
CLOSED
APDU Consolidated Pole Line Hardwares Requirement
01/18/2024
CLOSED
AP DU Power Circuit Breaker Requirements
12/18/2023
CLOSED
Project Crown
12/01/2023
CLOSED
Visayan Electric 2nd Floor Banilad Office Renovation
11/14/2023
CLOSED
2024 Steel Pole Requirements
10/27/2023
CLOSED
bottom of page